Sullivan West CSD Assessment

Holy Trinity Montessori School

Rotterdam-Mohonasen Central School District

Public School 18 – Delaware Community School

Long Beach Central School District

Poughkeepsie City School District

Albany City School District

Schenectady City School District

Troy Central School District

Sullivan West CSD Assessment

男朋为什么在被窝里吃我的胸Chazen performed limited assessment of the visible and accessible portions of the building envelope and structural systems at the northwest corner of the subject structure. Chazen observed the existing conditions using non-destructive means, interview facility personnel, review available record documents made available to us by the Client, assess the observed conditions, and recommend strategies to address those deficiencies for the Client’s use. In addition, Chazen assessed the ability of approximately 11,000 square foot an existing structural roof system to safely support the snow loads required in the current Uniform Code of New York State and its referenced standards at the Sullivan West Central School.

Holy Trinity Montessori School

Chazen collaborated with the project design team to provide full design, engineering, ecological, environmental, landscape architecture, planning and permitting for a new 12,000 square-foot school located in the City of Nashville, Tennessee. The overall campus layout was based upon the fundamental design principal of “peace, knowledge and faith” with a holistic approach to learning.

男朋为什么在被窝里吃我的胸Multi-level garden terraces, thousands of feet of retaining walls, box culverts, walking paths, and gathering areas were incorporated into the site design in order to promote different learning aspects into the student’s daily life experience. The site layout avoided wetland resources, maximized buffer areas, and preserved habitat by restricting site disturbance areas and maximizing open space.

 

 

 

Rotterdam-Mohonasen Central School District

Chazen provided design services for renovations and improvements at Mohonasen High School including the construction of an indoor swimming pool and various infrastructure improvements for building additions and renovations. Review of the project under the New York State Department of Environmental Conservation’s SPDES permit required evaluation of existing wastewater management systems, grease traps, multiple compartment septic tanks, dosing/effluent pump stations and sand filter disposal systems. Technical review considered chlorination/dechlorination system analyses and evaluation of effluent monitoring repairs.

Public School 18 – Delaware Community School

男朋为什么在被窝里吃我的胸Chazen provided civil engineering, landscape architecture and structural engineering services for a new elementary school located on the 1.2‐acre property of the former City of Albany School 18. The project involved the demolition of the existing school building and two adjacent residences and the construction of a new three‐story, 62,000‐square foot school building. Chazen provided design services including site grading, ADA compliance and accessibility review, foundation design, structural steel design and the design of two new drop‐off islands and a service road.

男朋为什么在被窝里吃我的胸The utility design involved connection to the existing water and combined sanitary and storm sewer systems. Chazen designed a subsurface stormwater detention system in accordance with City of Albany regulations. Construction phase services included review of shop drawings, requests for information, change order requests, continuous coordination of construction observation and a certification of completed works.

Long Beach Central School District

男朋为什么在被窝里吃我的胸Chazen provided Long Beach Central School District with engineering services for modernization of the high school campus and athletic facilities. Chazen assisted the District with design of a new vehicle circulation, parking designations for various users and bus routing. The existing arrangement of roadways and walkways was altered to increase safety by limiting access between buildings to bus only, transforming the area into a ‘pedestrian mall’ during school hours. Chazen also collaborated on the athletic field designs to create a new synthetic turf field for lacrosse, soccer and football. Athletic improvements at the high school also included softball and baseball fields, a practice field, handball and tennis courts. Chazen had primary design responsibility for stormwater management facilities, utilities, erosion and sediment control and pavement surfaces, with shared design responsibilities for landscaping, courtyard design and site amenities.

Poughkeepsie City School District

Chazen completed a number of projects for the Poughkeepsie City School District, providing surveying, civil engineering and landscape architecture services.

男朋为什么在被窝里吃我的胸Chazen’s most recent project involved design improved athletic fields at the high school. Chazen prepared the layout and design for several field components, including conversion of the existing football field and baseball fields into multi-use synthetic turf fields. The project also included the addition of sports field lighting, increased bleacher capacity, new property fencing and a new backstop. During the design of the project the District encountered several environmental issues related to fuel contamination and solid waste disposal. Chazen was able to quickly provide support services and help remediate the problem to the DEC’s satisfaction.

Albany City School District

男朋为什么在被窝里吃我的胸Chazen provided civil engineering and landscape architectural services for a new K‐6 elementary school building located on the former City of Albany School 21 site. The project involved the partial demolition of the former school building and one adjacent residence and the construction of a new three‐story school building.

Chazen provided design services including site grading, ADA compliance and accessibility review, design of a compact outdoor green space and playground and evaluation of bus drop off and city street one‐way traffic circulation options. The utility design involved connection to the existing water and combined sanitary and storm sewer systems. Chazen designed a sub‐surface stormwater detention system in accordance with City of Albany regulations. Chazen also provided construction specifications for the project manual. Construction phase services included review of shop drawings, requests for information, change order requests, continuous coordination of construction observation and a certification of completed works.

Schenectady City School District

As part of this $135,000 million capital improvement project, Chazen is responsible for the design and administration of various site improvements to Schenectady City School District facilities. Site specific improvements that were completed under the 1st phase of construction included a 6,200-square foot second floor addition and stair tower; reconstruction of the existing parking lot and playground at the Howe Elementary School; reconstruction of the softball field, existing bus drop-off/loading area and employee parking lot; the construction of a new ADA accessible parking lot and softball field at Oneida Middle School; and reconfiguration of walks and driveways at the Mont Pleasant Middle School to provide a new bus loading and drop-off area. Exterior renovation of existing buildings also included improved ADA compliant entrances and various site and utility improvements. Improvements at the Van Corlaer Elementary School included miscellaneous drainage improvements to the ball field and playground as well as construction of a new ADA accessible entrance served by a new elevator.  

In addition to those completed recently, Chazen is currently working on the design and bidding of the following:

Improvements at the Martin Luther King Jr. ES include hardscape and landscape renovations of 6 courtyards within the school, an addition to the library, installation of new sidewalks along Stueben Street, miscellaneous sidewalk repairs along the other streets surrounding the school, along with miscellaneous drainage improvements. Improvements at the Hamilton ES include reconstruction of the main entrance, stairs and sidewalks to accommodate a new ADA accessible entrance served by a new elevator, miscellaneous hardscape and landscape improvements to the campus, renovation of the existing playground located within the central courtyard, addition of two new stair towers, and miscellaneous sidewalk repairs along the streets surrounding the school, as well as drainage improvements in the northern courtyard.  Improvements at the Pleasant Valley ES include reconstruction of two existing courtyards to accommodate new stair towers to provide ADA accessibility and improve student circulation to and from the bus loop.  Project also included miscellaneous drainage improvements. Improvements at the Yates Arts-In-Education Magnet ES include reconstruction of the main entry to create an ADA accessible secure entry vestibule, pavement reconstruction of play area, misc sidewalk reconstruction, reconstruction/renovation of playgrounds, and miscellaneous athletic field improvements.

 

Troy Central School District

男朋为什么在被窝里吃我的胸The project entailed a full redevelopment of existing athletic fields and associated parking areas for the Doyle Middle School and High School campus. Chazen was responsible for the coordination and design of a synthetic multi-use football/soccer/lacrosse field (Field Turf), as well as a synthetic JV baseball and JV softball field complex. The project also included new discus throw, tennis courts, bleachers, dugouts, irrigation system modifications, drainage improvements, ticket booth, fencing, sidewalks, landscaping and parking upgrades. Additionally, the existing track was widened to eight-lanes and resurfaced with a high-end resilient surface. A new 150-seat baseball bleacher system, field lighting and an upgraded PA system were part of the design along with anew electronic score board, high jump, triple jump steeple chase and long jump facilities.

秒速赛车【gd1133.com光大彩票】-新闻 秒速赛车【gd1100.com光大彩票】-法治 秒速赛车【gd1144.com光大彩票】-案件 秒速赛车【gd1155.com光大彩票】-检察 秒速赛车【gd1166.com光大彩票】-理论 秒速赛车【gd1177.com光大彩票】-新媒体 秒速赛车【gd9900.com光大彩票】-视频 秒速赛车【gd9911.com光大彩票】-评论 秒速赛车【gd9922.com光大彩票】-文化 秒速赛车【gd9933.com光大彩票】-人物 秒速赛车【gd9944.com光大彩票】-舆情 秒速赛车【gd9955.com光大彩票】-装备 男朋为什么在被窝里吃我的胸 秒速赛车【gd9977.com光大彩票】-今日推荐 秒速赛车【gd1133.com光大彩票】-图片聚焦 秒速赛车【gd1100.com光大彩票】-以案说法 秒速赛车【gd1144.com光大彩票】-检察视界 秒速赛车【gd1155.com光大彩票】-城东区 秒速赛车【gd1166.com光大彩票】-城中区 秒速赛车【gd1177.com光大彩票】-城西区 秒速赛车【gd9900.com光大彩票】-城北区 秒速赛车【gd9911.com光大彩票】-大通县 秒速赛车【gd9922.com光大彩票】-湟中县 秒速赛车【gd9933.com光大彩票】-湟源县 秒速赛车【gd9944.com光大彩票】-经济技术开发区 秒速赛车【gd9955.com光大彩票】-城南新区 秒速赛车【gd9977.com光大彩票】-高新技术开发区 秒速赛车【gd1133.com光大彩票】-海湖新区 秒速赛车【gd1100.com光大彩票】-男朋为什么在被窝里吃我的胸 秒速赛车【gd1144.com光大彩票】-滚动 秒速赛车【gd1155.com光大彩票】-国内 秒速赛车【gd1166.com光大彩票】-国际 秒速赛车【gd1177.com光大彩票】-军事 秒速赛车【gd9900.com光大彩票】-社会 秒速赛车【gd9911.com光大彩票】-财经 秒速赛车【gd9922.com光大彩票】-产经 秒速赛车【gd9933.com光大彩票】-房产 秒速赛车【gd9944.com光大彩票】-金融 秒速赛车【gd9955.com光大彩票】-证券 秒速赛车【gd9977.com光大彩票】-汽车 秒速赛车【gd1133.com光大彩票】-IT 秒速赛车【gd1100.com光大彩票】-能源 秒速赛车【gd1144.com光大彩票】-港澳 秒速赛车【gd1155.com光大彩票】-台湾 秒速赛车【gd1166.com光大彩票】-华人 秒速赛车【gd1177.com光大彩票】-侨网 秒速赛车【gd9900.com光大彩票】-经纬 秒速赛车【gd9911.com光大彩票】-English 秒速赛车【gd9922.com光大彩票】-图片 秒速赛车【gd9933.com光大彩票】-视频 秒速赛车【gd9944.com光大彩票】-直播 北京PK10【gd9955.com光大彩票】-娱乐 PK10开奖【gd9977.com光大彩票】-体育 pk10平台【gd1133.com光大彩票】-文化 Pk10计划【gd1100.com光大彩票】-健康 pk10网址【gd1144.com光大彩票】-生活 pk10开户【gd1155.com光大彩票】-葡萄酒 pk10赛车【gd1166.com光大彩票】-微视界 PK10投注平台【gd1177.com光大彩票】-演出 PK10注册【gd9900.com光大彩票】-专题 PK10开户【gd9911.com光大彩票】-理论 北京PK10【gd9922.com光大彩票】-新媒体 PK10开奖【gd9933.com光大彩票】-供稿 pk10平台【gd9944.com光大彩票】-新闻 Pk10计划【gd9955.com光大彩票】-时事 pk10网址【gd9977.com光大彩票】-视频 pk10开户【gd1133.com光大彩票】-评论 pk10赛车【gd1100.com光大彩票】-股票 PK10投注平台【gd1144.com光大彩票】-区块链 PK10注册【gd1155.com光大彩票】-港股 PK10开户【gd1166.com光大彩票】-科创 北京PK10【gd1177.com光大彩票】-基金 PK10开奖【gd9900.com光大彩票】-私募 pk10平台【gd9911.com光大彩票】-理财 Pk10计划【gd9922.com光大彩票】-信托 pk10网址【gd9933.com光大彩票】-P2P pk10开户【gd9944.com光大彩票】-科技 pk10赛车【gd9955.com光大彩票】-债券 PK10投注平台【gd9977.com光大彩票】-互金 PK10注册【gd1133.com光大彩票】-期货 PK10开户【gd1100.com光大彩票】-原油 北京PK10【gd1144.com光大彩票】-大宗 PK10开奖【gd1155.com光大彩票】-期指 pk10平台【gd1166.com光大彩票】-保险 Pk10计划【gd1177.com光大彩票】-银行 pk10网址【gd9900.com光大彩票】-黄金 pk10开户【gd9911.com光大彩票】-外汇 pk10赛车【gd9922.com光大彩票】-行情 PK10投注平台【gd9933.com光大彩票】-数据 PK10注册【gd9944.com光大彩票】-房产 PK10开户【gd9955.com光大彩票】-汽车 北京PK10【gd9977.com光大彩票】-博客 PK10开奖【gd1133.com光大彩票】-农金 pk10平台【gd1100.com光大彩票】-名家 Pk10计划【gd1144.com光大彩票】-消金 pk10网址【gd1155.com光大彩票】-美股 pk10开户【gd1166.com光大彩票】-创投 pk10赛车【gd1177.com光大彩票】-游戏 PK10投注平台【gd9900.com光大彩票】-滚动 PK10注册【gd9911.com光大彩票】-新浪 PK10开户【gd9922.com光大彩票】-正义网