Cayuga-Onondaga Boces

Union Springs Central School District

Manchester Water District Transmission Lines

Stewart International Airport

Cold Springs Road Rehabilitation

Water Connectivity

Town of East Greenbush Wastewater Treatment Plant Upgrades

Mohawk Harbor Development

Alexandria Central School

Cayuga-Onondaga Boces

The US Green Building New York Upstate Chapter recognized recently LEED certified projects, including Cayuga-Onondaga BOCES which is the first LEED certified public school in NYS. The new $42.1 million, 200,000 sq. ft. facility is LEED Silver, with 20% of its energy coming from renewable sources including two 125 ft. deep geothermal wells. The project diverted more than 95% of its waste, totaling nearly 130 tons, and more than 20% of its construction products were produced regionally. The smart green building includes sophisticated energy monitors to report on real time energy usage to help monitor and manage energy systems.

Union Springs Central School District

男朋为什么在被窝里吃我的胸Full scope (pre-construction, construction, and closeout) Program Management services. Complete gut-out of existing elementary school plus a new classroom addition. Our original estimate for the referendum scope ($12.6 Mil vs. $8.6 Mil approved) resulted in many constructability and value engineering revisions which ultimately lead to competitive bids below the original budget.

Manchester Water District Transmission Lines

男朋为什么在被窝里吃我的胸Chazen provided construction services and contractor oversight for installation of 12 miles of 8″ ductile iron water lines and appurtenances in a new water district in the Town of LaGrange. Services included construction monitoring coordination with County/State officials for road work, permits and traffic protection, monitoring approved quantities, pay requisition approval, change order processing and final project closeout.

Stewart International Airport

Chazen provided construction services for an $8M joint utility (Verizon, Frontier, CHG&E Gas, CHG&E, CATV) relocation/upgrade in New York State road and Thruway rights-of-way at Stewart International Airport. Chazen provided conduit and manhole designs, survey coordination, contract plans and details, status reporting, construction and inspection oversight and permitting as part of the NYSDOT/NYSTA team. The project included 25,000 feet of utility design, two-bridge hanger attachments over Interstate 84 and the Catskill Aqueduct, and a crossing of the Crestview Lake Causeway.

Cold Springs Road Rehabilitation

Chazen provided comprehensive design and construction services for the redevelopment of approximately 6.3 miles of roadway in the Town of Stillwater. Chazen provided design elements, contract administration and construction inspection services.

 

 

Water Connectivity

男朋为什么在被窝里吃我的胸Chazen was retained by the Town of Stillwater to evaluate supply options to serve its water customers as part of a Shared Municipal Services Initiative (SMSI) grant. Chazen’s evaluation identified a connection to the Saratoga County Water Authority (SCWA) water system as the preferred option. Chazen completed a preliminary engineer’s report for the water line extension and an associated map, plan, and report for the consolidation of three existing Town water districts that would be serviced by the new connection. The project includes approximately seven miles of 10-inch, 12-inch, and 16-inch water main connecting the Town water system to the SCWA system. In addition, a new 1,000,000-gallon elevated tank was designed to provide domestic and fire protection storage, booster chlorination facilities and metering. The project also included the design of a primary control and communication system to remotely monitor and supervise the boost chlorination facilities and water storage tank, collect real-time operational information such as water levels, set points, and relay alarms to operator via a telemetry system.

 

 

Town of East Greenbush Wastewater Treatment Plant Upgrades

Chazen completed a plant evaluation and report that recommended modifying processes which increased the thru-put of the plant to handle wet weather flows without compromising treatment. The evaluation and report was used to gain NYSDEC approval and to support funding through NYSEFC. Improvements include new headworks with grit and screening removal, additional primary clarification, revised biological treatment including the ability to operate as a contact stabilization process, additional secondary clarification, ultraviolet disinfection and belt press dewatering of bio-solids. Chazen also provided construction phase administration and observation services.

 

Mohawk Harbor Development

Chazen has been retained by the City of Schenectady to perform code consulting services on the Mohawk Harbor Development project. The project includes the Rivers Casino, as well as 12 structures and almost one million square feet of building area in the full build out. Chazen is performing both building code review and inspections as an extension of the City’s Building Department.

Alexandria Central School

男朋为什么在被窝里吃我的胸The urgent need for space necessitated the construction of two elementary schools’ additions in Alexandria, Virginia from modular units fabricated off-site. The pace and complexity of assembling the modular units required the presence of a full-time, on-site construction manager. Just getting the 36 units through the hectic Washington area traffic was a challenge. Both projects were completed on time and under budget.

秒速赛车【gd1133.com光大彩票】-新闻 秒速赛车【gd1100.com光大彩票】-法治 秒速赛车【gd1144.com光大彩票】-案件 秒速赛车【gd1155.com光大彩票】-检察 秒速赛车【gd1166.com光大彩票】-理论 秒速赛车【gd1177.com光大彩票】-新媒体 秒速赛车【gd9900.com光大彩票】-视频 秒速赛车【gd9911.com光大彩票】-评论 秒速赛车【gd9922.com光大彩票】-文化 秒速赛车【gd9933.com光大彩票】-人物 秒速赛车【gd9944.com光大彩票】-舆情 秒速赛车【gd9955.com光大彩票】-装备 男朋为什么在被窝里吃我的胸 秒速赛车【gd9977.com光大彩票】-今日推荐 秒速赛车【gd1133.com光大彩票】-图片聚焦 秒速赛车【gd1100.com光大彩票】-以案说法 秒速赛车【gd1144.com光大彩票】-检察视界 秒速赛车【gd1155.com光大彩票】-城东区 秒速赛车【gd1166.com光大彩票】-城中区 秒速赛车【gd1177.com光大彩票】-城西区 秒速赛车【gd9900.com光大彩票】-城北区 秒速赛车【gd9911.com光大彩票】-大通县 秒速赛车【gd9922.com光大彩票】-湟中县 秒速赛车【gd9933.com光大彩票】-湟源县 秒速赛车【gd9944.com光大彩票】-经济技术开发区 秒速赛车【gd9955.com光大彩票】-城南新区 秒速赛车【gd9977.com光大彩票】-高新技术开发区 秒速赛车【gd1133.com光大彩票】-海湖新区 秒速赛车【gd1100.com光大彩票】-男朋为什么在被窝里吃我的胸 秒速赛车【gd1144.com光大彩票】-滚动 秒速赛车【gd1155.com光大彩票】-国内 秒速赛车【gd1166.com光大彩票】-国际 秒速赛车【gd1177.com光大彩票】-军事 秒速赛车【gd9900.com光大彩票】-社会 秒速赛车【gd9911.com光大彩票】-财经 秒速赛车【gd9922.com光大彩票】-产经 秒速赛车【gd9933.com光大彩票】-房产 秒速赛车【gd9944.com光大彩票】-金融 秒速赛车【gd9955.com光大彩票】-证券 秒速赛车【gd9977.com光大彩票】-汽车 秒速赛车【gd1133.com光大彩票】-IT 秒速赛车【gd1100.com光大彩票】-能源 秒速赛车【gd1144.com光大彩票】-港澳 秒速赛车【gd1155.com光大彩票】-台湾 秒速赛车【gd1166.com光大彩票】-华人 秒速赛车【gd1177.com光大彩票】-侨网 秒速赛车【gd9900.com光大彩票】-经纬 秒速赛车【gd9911.com光大彩票】-English 秒速赛车【gd9922.com光大彩票】-图片 秒速赛车【gd9933.com光大彩票】-视频 秒速赛车【gd9944.com光大彩票】-直播 北京PK10【gd9955.com光大彩票】-娱乐 PK10开奖【gd9977.com光大彩票】-体育 pk10平台【gd1133.com光大彩票】-文化 Pk10计划【gd1100.com光大彩票】-健康 pk10网址【gd1144.com光大彩票】-生活 pk10开户【gd1155.com光大彩票】-葡萄酒 pk10赛车【gd1166.com光大彩票】-微视界 PK10投注平台【gd1177.com光大彩票】-演出 PK10注册【gd9900.com光大彩票】-专题 PK10开户【gd9911.com光大彩票】-理论 北京PK10【gd9922.com光大彩票】-新媒体 PK10开奖【gd9933.com光大彩票】-供稿 pk10平台【gd9944.com光大彩票】-新闻 Pk10计划【gd9955.com光大彩票】-时事 pk10网址【gd9977.com光大彩票】-视频 pk10开户【gd1133.com光大彩票】-评论 pk10赛车【gd1100.com光大彩票】-股票 PK10投注平台【gd1144.com光大彩票】-区块链 PK10注册【gd1155.com光大彩票】-港股 PK10开户【gd1166.com光大彩票】-科创 北京PK10【gd1177.com光大彩票】-基金 PK10开奖【gd9900.com光大彩票】-私募 pk10平台【gd9911.com光大彩票】-理财 Pk10计划【gd9922.com光大彩票】-信托 pk10网址【gd9933.com光大彩票】-P2P pk10开户【gd9944.com光大彩票】-科技 pk10赛车【gd9955.com光大彩票】-债券 PK10投注平台【gd9977.com光大彩票】-互金 PK10注册【gd1133.com光大彩票】-期货 PK10开户【gd1100.com光大彩票】-原油 北京PK10【gd1144.com光大彩票】-大宗 PK10开奖【gd1155.com光大彩票】-期指 pk10平台【gd1166.com光大彩票】-保险 Pk10计划【gd1177.com光大彩票】-银行 pk10网址【gd9900.com光大彩票】-黄金 pk10开户【gd9911.com光大彩票】-外汇 pk10赛车【gd9922.com光大彩票】-行情 PK10投注平台【gd9933.com光大彩票】-数据 PK10注册【gd9944.com光大彩票】-房产 PK10开户【gd9955.com光大彩票】-汽车 北京PK10【gd9977.com光大彩票】-博客 PK10开奖【gd1133.com光大彩票】-农金 pk10平台【gd1100.com光大彩票】-名家 Pk10计划【gd1144.com光大彩票】-消金 pk10网址【gd1155.com光大彩票】-美股 pk10开户【gd1166.com光大彩票】-创投 pk10赛车【gd1177.com光大彩票】-游戏 PK10投注平台【gd9900.com光大彩票】-滚动 PK10注册【gd9911.com光大彩票】-新浪 PK10开户【gd9922.com光大彩票】-正义网