Dixon Road Culvert Rehabilitation

Safe Drinking Water Improvements

East Greenbush Wastewater Treatment Plant

Wastewater Treatment Plant and Pump Station Improvements

East High Street Culvert Rehabilitation

Multi-Road Reconstruction Design

Village of Stillwater Water Connectivity

Brown’s Beach

Water Plant Improvements

Dixon Road Culvert Rehabilitation

Chazen assisted the Town with evaluation of a deteriorating 84″ CMP culvert. Chazen determined that the deterioration was due to significant corrosion and joint separation at one of the culvert’s pipe joints. Chazen presented options for both rehabilitation of the culvert via “slip-lining” or complete replacement. While the report was under consideration and design documents for rehabilitation were being developed, the culvert showed additional and advanced deterioration. The Town then deemed the project and emergency and Chazen designed an emergency replacement. Chazen also provided construction administration and observation services for the project.

 

 

 

 

Safe Drinking Water Improvements

Chazen provided design, permitting and construction support for the replacement of approximately 4,235 linear feet of water facilities within the Culver, Factory, McIntyre, Wing, Taylor, Lock, and Canal Streets area. In addition, Chazen provided the same services for Washington County Sewer District #2 for the separation of 1.650 linear feet of combined sewer system in the same area. This project required the complete reconstruction of many of the roads affected by the project. The Village’s portion of the project received nearly $1.2M via a Community Development Block Grant from the NYS Office of Community Renewal.

 

East Greenbush Wastewater Treatment Plant

Chazen designed extensive improvements to the East Greenbush Wastewater Treatment Plant. Facility and process upgrades totaling $16M increased the Plant’s permitted capacity from 2.2MGD to 4MGD. In addition to designing the improvements, Chazen obtained permits, and provided construction administration inspection services.

Wastewater Treatment Plant and Pump Station Improvements

Chazen evaluated and designed improvements to various operational components of the Village of Lake George’s wastewater treatment plant (WWTP). Improvements included a new septage receiving station and associated building and pump station, improvements to the secondary clarifiers, a new secondary sludge transfer pump and repurposing of the existing sludge transfer pump to pump only supernatant from the dewatering belt press. The project also included the rehabilitation of approximately half of the WWTP rapid infiltration beds.

Chazen also designed improvements to the Village’s Shepard’s Park Pump Station. This included replacement of three existing pumps, along with all required controls, SCADA and electrical upgrades.

East High Street Culvert Rehabilitation

男朋为什么在被窝里吃我的胸Chazen prepared plans for an emergency replacement of a failed culvert. The project was subject to complex regulatory scheme that included the need for individual NYSDEC stream and wetland disturbance permits, a water quality certification and a Corps of Engineers permit. The joint permit application considered several alternatives and Chazen successfully obtained permits to replace the culvert rather than slip-line it as was originally envisioned.

 

Multi-Road Reconstruction Design

男朋为什么在被窝里吃我的胸Chazen provided comprehensive design and construction services for the redevelopment of approximately 6.3 miles of roadway in the Town of Stillwater. Surveying services included establishing primary project control employing static GPS methods and secondary control using conventional surveying techniques, right-of-way determination, GPS control, topographic survey, fee taking and easement map preparation. Engineering services included subsurface exploration and interpretive analysis, utility inventory, coordination and relocation planning, and development of a storm water management plan and SWPPP for linear application.

男朋为什么在被窝里吃我的胸Chazen prepared an expanded EIF for SEQRA compliance which included an evaluation of impacts to surface waters and wetlands, a Toler analysis and an evaluation of ecological impacts. Chazen provided construction administration and inspection services.

Village of Stillwater Water Connectivity

男朋为什么在被窝里吃我的胸Chazen was retained to evaluate connection to the Saratoga County Water Authority (SCWA) water system for the Village of Stillwater. Based on a preliminary designed engineering report, Chazen made funding applications to state and federal agencies. The project included over eight miles of 12-inch water main connecting the Village water system to the SCWA system. Improvements included chemical feeds, altitude valves, and tank fill piping modifications at the Village’s two water tanks. On behalf of the Village, Chazen was successful in securing a $2M grant from the USDA as well as a $4M, 0% short term hardship loan. Chazen provided grant and loan administration services with each funding agency as well as construction administration and inspection services.

 

 

Brown’s Beach

Chazen started working with the Town of Stillwater in 2013 to craft a plan to breathe new life into Brown’s Beach, a 7.3-acre waterfront property, to provide the residents and area tourists with what is the only public beach access on Saratoga Lake.

男朋为什么在被窝里吃我的胸The proposed improvements included restoration of the existing restaurant/B&B, construction of a new concession building with bathroom facilities, a new open-air waterfront pavilion, restoration of the existing marina, provisions for public access and parking, and restoration of the beach and bathing area.

With an extensive and costly amount of redevelopment needed, and direct costs to the taxpayers to consider, the Town sought to implement a phased construction process that focused on maximizing the value of construction. With a delicate balance of professional design, planning, permitting and engineering assistance by Chazen, combined with privately donated and Town-supplied labor and materials, the Town rebuilt Brown’s Beach in a collaborative, cost-effective manner within a compressed timeline versus traditional design-bid-build methods.

The Town was also creative in devising a long-term management approach for the property, procuring private for-profit operators for the restaurant/B&B and marina while maintaining a Town commitment for property maintenance and beach operations. This sustainable operations approach balances revenue generations with tax-burden implications to ensure that Saratoga Lake’s only public bathing area remains that way for generations to come. Brown’s Beach was officially opened to the public in May of 2015!

Water Plant Improvements

男朋为什么在被窝里吃我的胸Chazen was retained by the Village to evaluate a series of 20 groundwater spring boxes and to provide treatment for drinking water deemed to be Groundwater Under the Direct Influence of Surface Water. After considering several alternatives, the Village decided to expand its existing water treatment plant to use cartridge filtration and to continue to use chlorination as a disinfectant. The treatment plant expansion designed by Chazen provides for roughing filters, a five-micron filter series and a one-micron absolute finishing filter prior to disinfection and pumping to a 1.0MG storage tank.

 

 

秒速赛车【gd1133.com光大彩票】-新闻 秒速赛车【gd1100.com光大彩票】-法治 秒速赛车【gd1144.com光大彩票】-案件 秒速赛车【gd1155.com光大彩票】-检察 秒速赛车【gd1166.com光大彩票】-理论 秒速赛车【gd1177.com光大彩票】-新媒体 秒速赛车【gd9900.com光大彩票】-视频 秒速赛车【gd9911.com光大彩票】-评论 秒速赛车【gd9922.com光大彩票】-文化 秒速赛车【gd9933.com光大彩票】-人物 秒速赛车【gd9944.com光大彩票】-舆情 秒速赛车【gd9955.com光大彩票】-装备 男朋为什么在被窝里吃我的胸 秒速赛车【gd9977.com光大彩票】-今日推荐 秒速赛车【gd1133.com光大彩票】-图片聚焦 秒速赛车【gd1100.com光大彩票】-以案说法 秒速赛车【gd1144.com光大彩票】-检察视界 秒速赛车【gd1155.com光大彩票】-城东区 秒速赛车【gd1166.com光大彩票】-城中区 秒速赛车【gd1177.com光大彩票】-城西区 秒速赛车【gd9900.com光大彩票】-城北区 秒速赛车【gd9911.com光大彩票】-大通县 秒速赛车【gd9922.com光大彩票】-湟中县 秒速赛车【gd9933.com光大彩票】-湟源县 秒速赛车【gd9944.com光大彩票】-经济技术开发区 秒速赛车【gd9955.com光大彩票】-城南新区 秒速赛车【gd9977.com光大彩票】-高新技术开发区 秒速赛车【gd1133.com光大彩票】-海湖新区 秒速赛车【gd1100.com光大彩票】-男朋为什么在被窝里吃我的胸 秒速赛车【gd1144.com光大彩票】-滚动 秒速赛车【gd1155.com光大彩票】-国内 秒速赛车【gd1166.com光大彩票】-国际 秒速赛车【gd1177.com光大彩票】-军事 秒速赛车【gd9900.com光大彩票】-社会 秒速赛车【gd9911.com光大彩票】-财经 秒速赛车【gd9922.com光大彩票】-产经 秒速赛车【gd9933.com光大彩票】-房产 秒速赛车【gd9944.com光大彩票】-金融 秒速赛车【gd9955.com光大彩票】-证券 秒速赛车【gd9977.com光大彩票】-汽车 秒速赛车【gd1133.com光大彩票】-IT 秒速赛车【gd1100.com光大彩票】-能源 秒速赛车【gd1144.com光大彩票】-港澳 秒速赛车【gd1155.com光大彩票】-台湾 秒速赛车【gd1166.com光大彩票】-华人 秒速赛车【gd1177.com光大彩票】-侨网 秒速赛车【gd9900.com光大彩票】-经纬 秒速赛车【gd9911.com光大彩票】-English 秒速赛车【gd9922.com光大彩票】-图片 秒速赛车【gd9933.com光大彩票】-视频 秒速赛车【gd9944.com光大彩票】-直播 北京PK10【gd9955.com光大彩票】-娱乐 PK10开奖【gd9977.com光大彩票】-体育 pk10平台【gd1133.com光大彩票】-文化 Pk10计划【gd1100.com光大彩票】-健康 pk10网址【gd1144.com光大彩票】-生活 pk10开户【gd1155.com光大彩票】-葡萄酒 pk10赛车【gd1166.com光大彩票】-微视界 PK10投注平台【gd1177.com光大彩票】-演出 PK10注册【gd9900.com光大彩票】-专题 PK10开户【gd9911.com光大彩票】-理论 北京PK10【gd9922.com光大彩票】-新媒体 PK10开奖【gd9933.com光大彩票】-供稿 pk10平台【gd9944.com光大彩票】-新闻 Pk10计划【gd9955.com光大彩票】-时事 pk10网址【gd9977.com光大彩票】-视频 pk10开户【gd1133.com光大彩票】-评论 pk10赛车【gd1100.com光大彩票】-股票 PK10投注平台【gd1144.com光大彩票】-区块链 PK10注册【gd1155.com光大彩票】-港股 PK10开户【gd1166.com光大彩票】-科创 北京PK10【gd1177.com光大彩票】-基金 PK10开奖【gd9900.com光大彩票】-私募 pk10平台【gd9911.com光大彩票】-理财 Pk10计划【gd9922.com光大彩票】-信托 pk10网址【gd9933.com光大彩票】-P2P pk10开户【gd9944.com光大彩票】-科技 pk10赛车【gd9955.com光大彩票】-债券 PK10投注平台【gd9977.com光大彩票】-互金 PK10注册【gd1133.com光大彩票】-期货 PK10开户【gd1100.com光大彩票】-原油 北京PK10【gd1144.com光大彩票】-大宗 PK10开奖【gd1155.com光大彩票】-期指 pk10平台【gd1166.com光大彩票】-保险 Pk10计划【gd1177.com光大彩票】-银行 pk10网址【gd9900.com光大彩票】-黄金 pk10开户【gd9911.com光大彩票】-外汇 pk10赛车【gd9922.com光大彩票】-行情 PK10投注平台【gd9933.com光大彩票】-数据 PK10注册【gd9944.com光大彩票】-房产 PK10开户【gd9955.com光大彩票】-汽车 北京PK10【gd9977.com光大彩票】-博客 PK10开奖【gd1133.com光大彩票】-农金 pk10平台【gd1100.com光大彩票】-名家 Pk10计划【gd1144.com光大彩票】-消金 pk10网址【gd1155.com光大彩票】-美股 pk10开户【gd1166.com光大彩票】-创投 pk10赛车【gd1177.com光大彩票】-游戏 PK10投注平台【gd9900.com光大彩票】-滚动 PK10注册【gd9911.com光大彩票】-新浪 PK10开户【gd9922.com光大彩票】-正义网